Industry application
Wind Energy: start with the equipment and maintenance problem.
Project examples cover blades, drivetrains and associated electrical equipment.
Planning questions
What to review before installing sensors
- 01Which equipment, component or route should be monitored?
- 02Which operating states should form the baseline?
- 03Which inspection or condition data can help the team check a change?
- 04Who reviews an alert, and what information is needed before action?
Related projects
Case studies relevant to wind energy
These projects show where acoustic monitoring has been used. Results at a new site will depend on its equipment and operating conditions.
wind energy
National Energy Group Binhai Longyuan wind farm
Local processing and monitoring software connected acoustic data from turbine and transformer locations.
Read case study
wind energy
SPIC Xinjiang Energy Chemical Mulei wind project
The project studied acoustic monitoring for possible wind-blade defects and alerts.
Read case study
Discuss a pilot
Plan a wind energy pilot around one type of equipment and one maintenance question.
Share the product or equipment, the target market and the people you want to reach. We will reply with any questions and possible next steps.